Help!traslation my resume.
发布网友
发布时间:2022-04-30 04:53
我来回答
共1个回答
热心网友
时间:2023-10-14 08:23
Self-evaluation:
A good team spirit, good communication and coordination, enjoy learning new things; good thinking and careful, serious and meticulous work, to active work; willing to accept the challenge and be able to work under pressure.
And the performance of ties:
1, raw materials, testing, checking into the mold.
2, the follow-up inspection of proction, proction feedback.
3, the proction of non-performing statistics, corrected in a timely manner, to track the proction of non-performing segments, to prevent the bulk scrapped.
4, the use of quality control methods in the seven major proction quality control, proct quality protection.
1, responsible for proct line communications, drawing flow chart.
2, instrumentation equipment in advance to confirm that the proction of real-time tracking and reporting unusual deal with the situation immediately.
3, the proction of the project monitoring detection to ensure the quality of the GMP certification system qualified.
4, entry of the means of proction of electronic files, proction statistics statements, so that executives at any time that a state of proction.
5, the post is the convergence of proction and administrative offices, and departments are more closely linked, so to give full play to the subjective nature of co-ordination to protect the administration to proce a smooth transition.
The use of skilled OFFICE \ CAD and other office software; will HPLC chromatography, KF water meter testing equipment and so on; will test the use of measuring instruments, the level meter. From learning a lot of work on the quality of knowledge, the quality of further understanding, such as "5S norms" "QC practices of the seven" "5W2H" and so on.
紫名:记得悬赏分!不然我白忙了!
热心网友
时间:2023-10-14 08:23
Self-evaluation:
A good team spirit, good communication and coordination, enjoy learning new things; good thinking and careful, serious and meticulous work, to active work; willing to accept the challenge and be able to work under pressure.
And the performance of ties:
1, raw materials, testing, checking into the mold.
2, the follow-up inspection of proction, proction feedback.
3, the proction of non-performing statistics, corrected in a timely manner, to track the proction of non-performing segments, to prevent the bulk scrapped.
4, the use of quality control methods in the seven major proction quality control, proct quality protection.
1, responsible for proct line communications, drawing flow chart.
2, instrumentation equipment in advance to confirm that the proction of real-time tracking and reporting unusual deal with the situation immediately.
3, the proction of the project monitoring detection to ensure the quality of the GMP certification system qualified.
4, entry of the means of proction of electronic files, proction statistics statements, so that executives at any time that a state of proction.
5, the post is the convergence of proction and administrative offices, and departments are more closely linked, so to give full play to the subjective nature of co-ordination to protect the administration to proce a smooth transition.
The use of skilled OFFICE \ CAD and other office software; will HPLC chromatography, KF water meter testing equipment and so on; will test the use of measuring instruments, the level meter. From learning a lot of work on the quality of knowledge, the quality of further understanding, such as "5S norms" "QC practices of the seven" "5W2H" and so on.
紫名:记得悬赏分!不然我白忙了!