发布网友 发布时间:2022-05-24 09:10
共2个回答
热心网友 时间:2023-10-13 13:27
According to the center prepared medicine waste water organicpollutant density high, the waste water may the biochemistry stronger,the chromaticity quite high, many discharge, the sewage ingredient forthe intermittence is complex and so on the characteristic, in thematerial analysis foundation, finally determined uses the UASB+biology catalytic oxidation craft processing craft, to this centerprepared medicine proction waste water carries on processing, plansto enable the water leakage to achieve the People's Republic of China"Sewage Synthesis Discharges Standard" (GB8978-1996) center two levelsof standards. This design to main construction: The grill, the adjustment pond, theUSB reaction tower, the biological contact 氧化池, two sank thepond, the sludge thickening pond and so on has carried on the relateddesign calculation, and has carried on the shaping to the correlationmechanical device. Meanwhile carried on the design to entireprocessing system piping arrangement, the project expense has carriedon the budget, basically has contained project plan all contents. Biology catalytic oxidation热心网友 时间:2023-10-13 13:27
哥们,你分给的太少了,能有人给你翻译吗。