First, the mechanical and electrical problems
1, the power supply system: on-site power supply situation and requirements of the big gap between the power supply from the power supply equipment and focus on scientific and rational way in order to meet the construction requirements. (Including: power frequency, power consumption voltage, ground voltage electricity instry, the protection of ground and underground power supply)
2, the pressure of the wind systems: power supply system from the point of view, the pressure air supply and construction of about 30m3/min required 100m3/min not match.
3, the communication system: on-site needs to provide 25 internal telephone communication skills.
4, the monitoring system:
(1) Face to install gas monitoring and control system;
(2) improve the system of instrial video surveillance system needs to be installed.
5, the lift system: let us know, and ancillary equipment hoist the progress of orders.
6, spare parts: spare parts should be sufficient, otherwise it will affect the normal proction of equipment parts to solve the problem and to minimize maintenance
(1) selection of better quality components, equipment;
(2) Select the temperature of the equipment;
(3) The length of the warranty period of equipment use;
(4) randomly selected parts manufacturers to fully solicit opinion;
(5) before sorting equipment, construction equipment, make use of the environment, site conditions and requirements to tell manufacturers to guard against the wrong choice;
7, supporting materials, materials selection, and supporting tools used to support.
8, told us:
(1) on-site lighting and signaling systems used;
(2) on-site batching plant mixer and the situation;
(3) the case fan site;
9, there is possible to provide Chinese or English coal mine safety regulations in India;
10, electrical and mechanical aspects of writing a description of site conditions in order to know what the next step we have work to do to prepare;
11, to ensure that refuse does not affect normal use of equipment construction, we recommend: increase three PB-90-type rock rake bucket loading machines and accessories (not listed in the table the last device, you can do some research);
Second, the floor plan
During the ground of your permanent building layout, consider leaving enough space for us to install and use lifting equipment.