发布网友 发布时间:2022-05-02 02:49
共3个回答
热心网友 时间:2023-10-09 05:22
From the turnover box out side instrument panel body, sticking bar code to the body, and then flipped upside-down in the fetal membranes, and bar code scanning, the activation of the Q-cos system, start counting function. Remove cup holder and a reinforced skeleton, card connected to the body, with a torque gun mounting screws. Then from the material box out of the storage box, the storage box is pressed into the skeleton. Then from the material box out arm, the shaft pin into the tooling guide track of steady hands card, press the button to start the tooling, connecting arm and the skeleton. Then after removal from the material box panel, the drawer is fully open, avoid the skeleton the block, and then the rear panel assembly card to the backbone, and the drawer shut. Then the card by environmental light. Then the assembly is connected with the power supply, assembly is placed in the illumination uniformity of tooling, contrast brightness. The assembly into the sorting rack.From the turnover box out side of dashboard framework, sticking bar code to the skeleton, clamping AUX mole and an auxiliary power supply. And then flipped upside down on the membrane skeleton, the installation of security mole and an antenna mole. Then the assembly harness. Then install the bracket. Then install the liner and the storage box baffle. Then install the cup liner and the cup holder frame to auxiliary instrument board framework. Installation of roller shutter door slide and rolling shutter door. Then install armrest slide to skeleton. Then install handrails to skeleton. Then install the left side panel and the rear panel. Then the assembly connected to the electrical test equipment inspection. The assembly into the sorting rack.参考资料:百度在线翻译
热心网友 时间:2023-10-09 05:23
From the turnover box out side instrument panel body, sticking bar code to the body, and then flipped upside-down in the fetal membranes, and bar code scanning, the activation of the Q-cos system, start counting function. Remove cup holder and a reinforced skeleton, card connected to the body, with a torque gun mounting screws. Then from the material box out of the storage box, the storage box is pressed into the skeleton. Then from the material box out arm, the shaft pin into the tooling guide track of steady hands card, press the button to start the tooling, connecting arm and the skeleton. Then after removal from the material box panel, the drawer is fully open, avoid the skeleton the block, and then the rear panel assembly card to the backbone, and the drawer shut. Then the card by environmental light. Then the assembly is connected with the power supply, assembly is placed in the illumination uniformity of tooling, contrast brightness. The assembly into the sorting rack.From the turnover box out side of dashboard framework, sticking bar code to the skeleton, clamping AUX mole and an auxiliary power supply. And then flipped upside down on the membrane skeleton, the installation of security mole and an antenna mole. Then the assembly harness. Then install the bracket. Then install the liner and the storage box baffle. Then install the cup liner and the cup holder frame to auxiliary instrument board framework. Installation of roller shutter door slide and rolling shutter door. Then install armrest slide to skeleton. Then install handrails to skeleton. Then install the left side panel and the rear panel. Then the assembly connected to the electrical test equipment inspection. The assembly into the sorting rack.热心网友 时间:2023-10-09 05:23
太长了吧!