劳烦各位帮忙将建筑图纸上的话翻译成英文,求各位了,能翻译多少翻译多少!!急!
发布网友
发布时间:2022-05-01 09:13
我来回答
共3个回答
热心网友
时间:2023-10-10 04:49
20 thick cement mortar 1:2.5
80 thick C15 concrete
70 thick gravel cushion
Su-soil foundation
Dampproof layer doped C20 fine aggregate concrete waterproofing agent
10 thick 1:2 cement mortar including squarrosa
20 thick 1:2 cement mortar plus waterproof agent Noodles
Cement mortar drainage trench 1:20
Sheet surface
1:3 cement mortar
100 thick reinforced concrete slab
8 thick防滑地砖
22 thick paste layer of cement mortar 1:2.5
50 small stone thick layer of concrete poured the whole 06 @ 200 with a two-way reinforced
Ramp profile
Stainless Steel
Brick time
Filling sealing material
Pool cover details
Length L30 * 50 * 6
Finished cast iron plate
Indoor surface
Frame structure
Cast-in-place reinforced concrete structure construction of the ground floor should be reserved for the construction surface layer thickness, the first level-story building set aside 80mm ,1-3 level-story building set aside 50mm
Doors and windows are the size of the hole size, dimensions in mm
Architectural Design Help
Total Plan
Kitchen, bathroom complete the floor surface should be lower than the adjacent 20mm, the ground should be omitted geotropism direction pan of water, ground water to be done to deal with. Are used in polyurethane waterproof coating to make 40 fine aggregate concrete thick layer of protection.
Outdoor terrace and outdoor corridors, platforms
凡需hanging flat-topped upper floor room with its construction design requirements set aside by hanging bars or buried pieces.
Wall
The use of local common wall filled wall
Homemade cement hollow brick
The interior walls are: in the door,窗洞connections should legislate accordingly墙厚size reinforced concrete columns and beams have been poured at the same time trace. Reinforced concrete column reinforcement and details, see the structure of working drawings.
The materials used to paint the inside and outside the walls and practices detailed in the table with the materials used to paint the part of the external walls.
Moisture-proof walls
Skirtboard
The ground should slope to drain the direction of the gradient of 1% ~ 5%, to drain the mouth elevation above sea level should be below ground 20mm, floor drain to a radius of 250mm as the central framework, drainage slope should be 3% -5%
Ground waterproof layer should be迎水面done in structural layer above
Leveling
Rust-proof steel components are required to do a second coat, finish second.
Unless otherwise indicated,
The projects are mainly aluminum alloy windows
Site elevation and the ramp, road drainage see the total plan
Green venues are detailed layout design Landscape
Settlement joint
Joints
6 thick leveling layer of cement mortar 1:1.5
Color wall paint a face at the end of the Second
Mao stone, cultural stone
Shimizu tile layer
White latex paint at the end of a second
20 thick polished granite or marble
200 thick layer of cement cinder
Su-soil foundation
A total construction area
On the ground floor area
Underground construction area
Covers an area of building area
Building density
FAR
Greening rate
Building low-rise
Building height
Units than
Wall
Groundwater King room
See semi-basement retaining wall. .
Septic tanks
500 W polymer waterproof coating
Angle
The basement floor and wall waterproofing details
Waterproofing membrane
Open the direction of plate
Overhaul 1:10 manhole node details
Steel ladder
Expansion bolts
Hinge, bolt, galvanized iron sheets, 60 * 40 frame, galvanized steel pipes, to reconcile the Chatham
Disabled ramp enlarge plane
Potting cement mortar, cement mortar plastering, asphalt caulking
Flange, screw fastening solid
Gutter inclined roof drainage
Roof profile large samples 1:10
The roof of the chimney, parapet
Iron railings manufacturers detailed design
Embedded iron
Indoor and outdoor window railing
Facade flower details, asphalt
Please refer to detailed matters not related to the construction and acceptance of national norms.
Road sections
The structural design of the total note
The works do seismic design, special-shaped column frame
Secondary level of security
Independent foundation
Design basis
Second beam, main beam, main beam主筋
Large sloping roof-like structure
Retaining wall section
Based on floor plan
Structural layer floor elevation
One column layout Network
Based on the top surface to the second floor of the floor
Floor beam reinforcement plan
The layer structure elevation: -0.050; undated beam surface elevation with the corresponding plate surface elevation
Primary and secondary beam junction to be in the main beam with both sides of the additional three stirrups, the diameter of the original主筋with stirrups, spacing of 50 and are in the main beam re-attached tendon hanging.
Contour meeting press map interface beam stirrups encryption:
Undated thickness for 100mm
Roof beam reinforcement plan
Basement floor structure
Not specified for the distribution of tendons. .
Stretching from the main beam semi-platform elevation
Encryption scope column stirrups
一些翻译不出来,不好意思- -
热心网友
时间:2023-10-10 04:50
20 thick 1. 5 cement mortar
80 thick d23 for concrete
70 thick gravel mattress
Grain soil ramming
Moistureproof layer C20 fine stone concrete mixing water-proofing agent
10 thick Europe 2 cement mortar is rough
2 the cement mortar added 20 thick powder water-proofing agent
The cement mortar drainage: edible
Sheet metal surface
1 the cement mortar
100 thick plate reinforced concrete
8 thick prevent slippery floor tile
22 thick cement mortar paste 1. 5
50 thick layer of fine stone concrete casting matchs 06 @ within 200 two-way reinforced
Ramp profile
Stainless steel
Bricks
Filling sealing materials
Cistern cover drawing
Through 50 * * 6 L30 long
Finished iron plate
Indoor ground
Frame structure
Cast-in-place reinforced concrete floor surface structure construction should be reserved, the thickness of the building surface layer construction 80mm reserve level, and 1-3 buildings reserve level 50
As the window size, size unit size for mm
Architecture design
Total plan
Kitchen, toilet should be finished floor lower than adjacent surface, the ground should be to 20mm floor drain directions, ground water to do extensive water. Adopted in polyurethane waterproof coating on 40 thick layer of fine stone concrete.
Outdoor balcony and outdoor corridor, the platform
All the rooms to condole roof top floor construction according to the design requirements of crane steel or built-in reserve.
Wall body
Used by local filling wall body
Homemade cement hollow bricks
With the door, wall: in connection should be made corresponding humanly scaled wall thickness of reinforced concrete column with the size and poured lintels. Reinforced concrete columns of reinforcement and the detail see structure construction.
Outside metope paint materials and methods for material list external paint.
Wall body moisture
kick
The ground floor drain directions to slope gradient, is 1% ~ 5%, floor drain mouth should be below the ground elevation 20mm elevation, floor drain 250mm radius scope for the center, drainage slope should 3% ~ 5%
The ground in water, waterproof layer should do in structure layer above
Make level
Steel components are required to do anti-rust primer, paint.
Unless specified
The project mainly for aluminum alloy Windows outside
Site elevations and ramp, total plan in pavement drainage
In the field of landscape environment afforest decorate design details
Settlement joints
Adjustable seam
6 thick 1 5 cement mortar screed-coat
A bottom 2 exterior coating color
Rubble, culture stone
Water brick layers
White emulsioni paint a bottom 2 degrees
Polished granite and marble 20 thick
Two thick cement cinder bed
Grain soil ramming
Total building area
The building area
Underground building area
Covering building area
Building density
cubage
green
Construction layer
Building height
Family than
fence
The underground water room
Half of the retaining wall in the basement. .
Septic tank
500 wide polymer waterproofing paint
Angle
The basement floor and lateral wall waterproofing map
Waterproof coiled
Cover open direction
1 detail drawings overhaul manhole
Steel ladder
Expansion bolt
Hinge, pin, galvanized iron, 60 * 40 borders, galvanization, the harmonic lacquer
Disabled ramp amplification plane
Cement mortar cement mortar potting, plastering, asphalt caulking
Flanges, screw twist fixed
Roof drainage inclined class
Figure 1. DaYang section roof
Roof chimney, parapet
Wrought iron baluster see manufacturer to design
Embed iron
Interior window rail
Flower elevation drawing, asphalt
Please refer to the country not exhaustive matters relevant construction and acceptance.
Road cross-sectional figure
Structure design always shows
This project was not do, seismic design frame
Safety level 2
Independent foundation
Design basis
Second beam, girders, main girder
Slope roof DaYang structure
Retaining wall sections
Basic layout
Structure floors elevation
A layer of column net arrangement
Second floor to the top surface of foundation
A beam of reinforcement
This layer structure elevation 0.050; : - Does not indicate surfaces with corresponding surface elevation beam
Primary beam must be within each additional girder in three sides with the owner of the stirrups, diameter steel reinforcement spacing for 50, and, in the steel crane girder the additional.
According to the high times beams intersect stirrup encryption:
Not specified thickness for 100mm
The roofing beams reinforced figure
The basement floor structure
The distribution of reinforcement is not specified. .
From the main platform stretch to half
Column range stirrups encryption
应该对吧!!!!
热心网友
时间:2023-10-10 04:50
太长了 你查网上的字典 很方便的 给我100分我会考虑给你翻