高手~~帮帮忙,翻译下 不胜感激
发布网友
发布时间:2023-06-08 13:02
我来回答
共1个回答
热心网友
时间:2024-01-26 15:42
我真没用google 要是用了 我自宫以谢天下
National various branch schools like have the demand to extend or repair and so on, is responsible for each addition project alternative either the repair plan draws up the organizational work, after the plan forms, in every way the inquiry, the comparison, the determination construction or the supply unit. the participation is responsible for the project the project contract award, the negotiated price, the utilization specialized knowledge as well as for the construction market understanding, reasonable causes the Construction to rece the quoted price, the only two phase of workshops (G1-3 level 70,000 squares, office building 4 12,000 square meters, dining room building 3 8,500 square meters, security storehouse 1 3,000 square meters) undergo the multiwheel negotiated price, saves approximately for the company the 3,000,000 Yuan. in the project construction process, is responsible for the management engineering quality, the cost and the time, examined every day the construction working procere, the craft, the inspection construction finishing material, takes strict precautions against the situation occurrence which each kind cheats on labor and materials. Participates in various sub-items project the approval, draws up the progress of works plan, the coordinated construction, the installment, the municipal administration and so on different Construction coordinates the construction. Verifies each Construction daily resilience, and instructs the Construction to complete in various time node the construction. Guaranteed that the project on time or finishes ahead of time, meets company's order form proction needs. the job location safety control, the establishment control system, divides into the third-level management, the related item responsibility arrives at the human, every day carries on the inspection to the scene, to discovery each kind of safe hidden danger, forms the written matter, orders the Construction to reorganize by a set time. The regular surveillance Construction organizes the worker to carry on the study, and sets the specific request, establishes the related rewards and punishments system. Sets up the safety board account, and periodic inspection checking. organizes and participates in completion approval, through the approval part, the surveillance Construction has not reorganized. After reorganizing completes, organizes the re-check. is responsible for the newspaper construct the work independently, handles the complete set construction, the environmental protection, the plan credential (land certificate, planning permission, construction permission, file approval, construction use permission, real estate evaluator and so on). Government departments and so on familiar construction, environmental protection, plan regarding building program's each related policy standard, the request, understood promptly the policy standard the revision, makes the revision promptly to the company project's construction and the design. Once promptly understood the Planning department to along the main yang or male principle construction highly and the building density request, has made the adjustment to company's dormitory area architectural design plan, has avoided 700,000 Yuan expenses which, because the later period adjusts loses and nearly one month-long time. is responsible to complete the factory district damage control to service, the fragmentary improvement project contract award and the progress, the quality, the material, the cost control