你好,具体翻译如下
The meeting mainly discussed how to implement our original wire (Raw Cable) inventory stock (Stock-checking) and proction standards for raw materials model (Make Standard Material Sample) and other issues. Specific implementation steps are as follows:
1. Koya Line to provide all raw materials within the company number to Ricky.
2. Ricky on this list were marked out of raw materials has a standard model of the part number, list and refresh this were input into the computer
3. . to organize a good list to print and distribute Team of the engineers.
4. Koya stock inventory to be prepared when the need PE BAG. (scissors and stickers may also need to be prepared)
5. The engineers (including Ricky) Ricky provided a list of inventory based on inventory and proction standards for raw material sample. Operate as follows: in their own area of responsibility, according to the material on the card part numbers marked on the list to find the corresponding part number, the shear the original wire and marked a good part numbers and then into the PE BAG. (wire model of the original group of at least one visible marking, wire marking do not required) to register the last on the list.
6. The engineer described the material record query FileMarker In the electronic version of the list in the corresponding ITEM
7.. The engineers will collect samples of the original wire, drawings and list to Ricky, Ricky is not sorted out the list of expected number of samples and print out the corresponding drawings to IQC. if future incoming, will be responsible for the proction standard IQC samples.
8. To complete the model, together with drawings of a good standard of raw materials reviewed by the supervisor, if adopted, will be submitted to the DCC release IQC save.
9. Expected the next meeting scheled for next Monday (11/22)
For regional and focused on each unified description of materials and other issues.
热心网友
时间:2023-10-13 03:09
1. Koya Line to provide all raw materials within the company number to Ricky.
2. Ricky on this list were marked out of raw materials has a standard model of the part number, list and refresh this were input into the computer.
3. To organize a good list to print and distribute Team of the engineers.
4. Koya stock inventory to be prepared when the need PE BAG. (Scissors and stickers may also need to be prepared)
5. The engineers (including Ricky) Ricky provided a list of inventory based on inventory and proction standards of raw materials model.
Operation as follows:
In their own area of responsibility, according to the material labeled material number on the card on the list, find the corresponding part number, cut the original wire and marked a good part numbers and then into the PE BAG. (Wire model of the original group of at least one visible marking, do not wire marking requirements) last on the list for registration.
6. The engineers check FileMarker describe the material recorded in the electronic version of the list in the corresponding ITEM.
7. The engineers will collect samples of the original wire, drawings and list to Ricky, Ricky is not sorted out the list of expected number of samples and print out the corresponding drawings to IQC. If future incoming, will be responsible for procing standard samples IQC .
8. To complete the model, together with drawings of a good standard of raw materials reviewed by the supervisor, if adopted, will be submitted to the DCC release IQC saved.
9. Expected the next meeting scheled for next Monday (11/22)