Dale Hollow Dam and Lake on the Obey River in Clay County near Celina, Tennessee, USA. The dam provides flood control and has a 54-MW hydroelectric power plant.
戴尔霍洛大坝建在美国田纳西靠近Celina的Clay郡的Obey河上。大坝的功能是防御洪水,并且有54兆瓦的水力发电厂。
至于修建时间、修建者资料中没有提到,但我认为其修建时间可能是美国罗斯福新政时期,即1933年左右。那时进行的田纳西流域综合治理中,对田纳西河及其支流进行了流域的梯级开发,兴建了许多水电站和大坝。而修建者,我认为是当时的失业人员或是军队。因为罗斯福新政时采取“以工代赈”的措施来解决就业问题。
参考资料:http://commons.wikimedia.org/wiki/File:USACE_Dale_Hollow_Dam.jpg
热心网友
时间:2023-10-18 16:38
Dale Hollow locate on The Dale Hollow Reservoir which lies mainly in northern Tennessee, where it covers portions of Clay, Pickett, and Overton Counties. Small arms of the lake also extend northward into the Kentucky counties of Cumberland and Clinton. The project consists of 27,700 acres (112 km²) of water and 24,842 acres (101 km²) of surrounding land.
Dale Hollow Dam and Lake was authorized by the Flood Control Act of 1938 and the River and Harbor Act of 1946. The project was completed by the United States Army Corps of Engineers in 1943, making the lake the oldest artificial lake in Kentucky. Hydroelectric power generating units were added in 1948, 1949 and 1953. The project was designed by the Corps of Engineers and built under their supervision by private contractors. The hydroelectric generators of Dale Hollow Dam are used to supply power to the surrounding countryside. The dam, powerplant and reservoir are currently operated by the Nashville District of the Corps.
The lake takes its name from William Dale, a government surveyor and veteran of the War of 1812. Settling originally in Willow Grove, Mr. Dale bought his first 449 acres (1.8 km²) of land nearby in 1808. The farm eventually grew into a plantation known as Dale Hollow; he and his descendants lived there until the dam was started in 1942. The waters of the lake would ultimately cover both the farm and Willow Grove, “the town that drowned”.
戴尔霍洛大坝建在美国田纳西靠近Celina的Clay郡的Obey河上,戴尔霍洛大坝工程由1938年的控制洪涝法案授权通过,在1943年由美国陆军工兵部队建造完成,又分别在1948年、1949年、和1953年增建了水力发电站以利用水力能源,这项工程由陆军工兵设计并在私人承包商的监督下由陆军工程兵完成的。
至于原因,应该像三峡一样,出于防洪,进一步利用水能,一举两得!
热心网友
时间:2023-10-18 16:39
您好
您可以到我们的戴尔的技术论坛里面去查询一下信息,这里的内容很全面。
http://support1.ap.dell.com/cn/zh/forum/thread.asp?fid=15&tid=286358
热心网友
时间:2023-10-18 16:39
你好!建议你使用谷歌搜索引擎搜索一下,这个是国外的,国内资料很少的~